Home · Cased-Hole Mini-Frac
The problem
Many wells only become available for stress testing after casing. You still need fracture gradient and closure data that match the intervals you will stimulate or inject into.
How we approach it
We design the perforated or ported interval, isolation (if required), and injection schedule so the diagnostic event represents the stage of interest. Analysis accounts for near-wellbore friction and whether the signature supports the completion plan.
Typical deliverables
- Cased-hole interval and perforation/port plan input
- Injection / shut-in dataset
- Stress and friction interpretation notes
- Completions-ready summary
Related programs
Open-Hole Mini-Frac
Pre-casing alternative.
Diagnostic Fracture Injection Test
Diagnostic workflow page.
In-Situ Stress Testing
Stress program overview.
Next step
Call {{CALLRAIL_NUMBER}} or use the form — include basin, well type (open-hole or cased), and the decision the data must support.