Specialty

Open-Hole Mini-Frac

Open-hole mini-frac programs when you need stress on the formation face before casing locks the wellbore geometry.

Home · Open-Hole Mini-Frac

The problem

Once casing is set, you measure through perforations or ports. Open-hole windows are the chance to see formation response directly — if isolation and hole condition allow a clean injection.

How we approach it

We assess hole condition, straddle or packer options, and injection limits with your drilling / completions team. The goal is a usable pressure signature without jeopardizing the wellbore. Timing against the drilling schedule is part of the plan, not an afterthought.

Typical deliverables

  • Open-hole feasibility and isolation plan
  • On-site injection and shut-in with QC
  • Interpreted closure / stress indicators
  • Handoff notes for casing and completion design

Related programs

Next step

Call {{CALLRAIL_NUMBER}} or use the form — include basin, well type (open-hole or cased), and the decision the data must support.

Questions operators ask

When is open-hole preferred?

When pre-casing stress is critical to landing zone or casing design decisions and hole conditions support isolation.

What if hole condition is poor?

We say so early. A compromised open-hole test wastes a critical-path window — cased-hole options may be the honest path.

Example scope?

See the example open-hole mini-frac program under Case Studies — labeled as an example scope until real jobs are published.

Ready to scope this program?

Calgary-based coordination for Western Canada field windows.

Call {{CALLRAIL_NUMBER}} · Contact

Call {{CALLRAIL_NUMBER}}